Zvago St. Anthony Park is set to open early 2019.
We are beginning to get a glimpse of what the exterior of the building will look like, as the brick veneer is going up and siding begins next week! Sheetrock is being installed on the second floor in Zone 1 and taping has started on the third floor. Insulation is going in on the first floor of Zone 1, and the roof membrane is being installed in Zone 2. Electrical is being boxed out in Zone 2, and wire is being pulled in the Zone 1 units and common areas.